UNIBLOCK™ UBTD+
Piller · DRUPS

Piller UNIBLOCK™ UBTD+

UNIBLOCK™ UBTD+ combines a rotary UPS and a diesel engine in one integrated unit. The load is normally fed from the utility through an isolating coupling choke; during an outage the energy store keeps the machine running while the diesel engine starts and takes over the load through a free-wheel clutch.

500–2700 kWpower
Up to 40 MWparallel
Up to 97 % with energy store connectedefficiency
Battery or POWERBRIDGE™energy store
  • Data centres needing high power per machine
  • Hospitals and infrastructure where fault clearing and selectivity matter
  • Industry with motor loads and large load steps (Piller states 100 % step loads)
Price on requestRange: 500–2700 kW per machine

Technical data

ManufacturerPiller
TypeDRUPS
Power500–2700 kW
ParallelUp to 40 MW
EfficiencyUp to 97 % with energy store connected
Energy storeBattery or POWERBRIDGE™
VoltageLow and medium voltage
CoolingAir or chilled water
Service lifeMore than 20 years

Source: www.piller.com; www.piller.com.

Technology

How it works

At its heart is the UNIBLOCK™ machine, where motor and generator windings share one stator and one brushless rotor. The result is a compact machine with low sub-transient reactance – meaning low harmonic distortion and strong ability to clear downstream short circuits.

Together with the machine, the coupling choke acts as a bi-directional filter: Piller states 99 % harmonic isolation between load and utility, compensation for voltage sags down to 50 % without disconnection, and protection against brownouts to −30 % without using the energy store.

Diesel start can be delayed from seconds to minutes, so short disturbances are ridden through without an engine start. With POWERBRIDGE™, Piller states typically three times longer bridging time than other UPS solutions.

UNIBLOCK™ UBTD+

Application

Where it fits

  • Data centres needing high power per machine
  • Hospitals and infrastructure where fault clearing and selectivity matter
  • Industry with motor loads and large load steps (Piller states 100 % step loads)
  • Sites where UPS and standby power should be the same machine

Versions and options

  • Containerised version, factory-built and ready to connect
  • Water-cooled version with its own heat exchanger on the building chilled water
  • Medium-voltage solutions
  • Isolated parallel (IP bus) configuration
UNIBLOCK™ UBTD+

Service

Operation and maintenance

Piller states that nothing in the standard design requires off-site refurbishment, that there are no power capacitors or fans to replace periodically, and that the UNIBLOCK™ machine life easily exceeds 20 years.

A rotary plant should always be load-tested at commissioning – stepped load, utility failures and transfer to engine.

Load bank test

Other models from Piller

Read more at Bluecircle

Norwerk’s partner Bluecircle has in-depth pages on the topic.

Do you have a project or a system that needs service?

Send us the load, required autonomy and voltage level – or describe the task. We will come back with a solution sized for your operation.

+45 50 53 13 17kontakt@norwerk.dkGet a quote